Project Eleven
Biotech Vaccine Facility
This client required a Biotechnology Vaccine Facility under ISO 6 Classifications. The facility included several airlocks (MAL & PAL, materials), personnel workflow patterns, FFU units with remote controlling capability, positive/negative pressure gradients, environmental monitoring, door interlocking, and low level wall returns to plenum. The facility was completed to GMP grading with heavy-duty panels for the wall system and a flush finish. The construction timeline was 2 months from start to end.
Mississauga, ON
$500k CAD
![is-class is-class](https://www.achengineering.com/wp-content/uploads/2020/09/is-class.png)
ISO 6
Completed
2500 sq. Ft
1 Month